1. The Role of Critical Path Method (CPM) Analysis in Construction Litigation
In mega-projects across Riyadh, Doha, Dubai, and Cairo, narrative descriptions of delay are insufficient; each delay event (late drawings, utility obstructions, variation orders) must be forensically linked to its impact on the Primavera baseline Critical Path.
2. Defeating Liquidated Damages & Proving Prolongation Cost Claims
When a court-appointed engineering expert overlooks Concurrent Delay and attributes full delay penalties to the contractor, our audit unit prepares an integrated legal-engineering refutation proving entitlement to penalty reversal and time-related prolongation costs.
3. Auditing Taking-Over Certificates, Defects Liability & Price Escalation
We rigorously litigate deemed Taking-Over Certificate (TOC) claims where employers wrongfully withhold completion sign-off, alongside statutory and contractual material price escalation claims.